Installing a VHR transmission on a Q50 is a detailed job. Here is a step-by-step guide with timestamps from the video for you to follow along with:
1. Pre-Installation Checks
-
Dowel Pins: Check both the engine and the new transmission for dowel pins. You only want one per hole; if both have them, you must remove one so they don't fight each other [00:20].
-
Alignment: Ensure the torque converter and flywheel are aligned so you can easily install the first bolt once the unit is up [01:01].
-
Shift Arm: Make sure the shift arm is in the down position before lifting the transmission into place to avoid clearance issues [02:06].
2. Lifting & Mating the Transmission
-
Clearance: Watch out for the crankshaft sensor. The bell housing can easily catch and snap it if you aren't gentle [02:13].
-
Seating: Maneuver the transmission into the subframe notch and slide it onto the dowel pins until fully seated [02:48].
-
Bell Housing Bolts: Start by hand-threading one bolt on each side to apply even pressure, then snug them up to pull the engine and transmission together [03:28].
-
Top Bolts & Breather: The upper bolts are reached from the back. Ensure the breather tube bracket is secured under one of these bolts [05:47].
3. Reconnecting Components
-
Wiring Harness: Reattach the harness using the five 10mm bolts [07:33].
-
Cooler Lines: Reinstall the transmission cooler lines, ensuring there is a copper washer on both sides of the line [09:06].
-
Transmission Mount: Attach the mount to the transmission first, ensuring the shift linkage is positioned above it [10:59]. Jack the assembly up to align the mount with the chassis [11:32].
-
Starter & Sensors: Reconnect the starter power wire and plug in the transmission sensors [12:15].
4. Final Mechanical Steps
-
Drive Shaft: Slide the drive shaft into the transmission. Apply red Loctite to the bolts for safety and tighten the center support bearing [15:02].
-
Shifter Linkage: Slide the linkage back onto the transmission and tighten the nut [16:25].
-
Torque Converter Bolts: Rotate the engine to install the four torque converter bolts through the inspection hole. Use Loctite here as well [17:34].
5. Filling & Leveling Fluid
-
Initial Fill: Use a fluid pump to push about 5 quarts into the transmission through the fill plug at the bottom [20:36].
-
Cycling Gears: With the car running and in neutral, shift through all the gears (including manual mode up to 7th) to circulate the fluid [24:03].
-
Final Leveling: With the engine running in neutral and at operating temperature, allow excess fluid to drain from the fill port until it is just a light drip, then reinstall the plug [25:03].
You can watch the full process here: https://youtu.be/aTtPh7Q3FMg